Materials such as tape, rope and extrusions come in a defined length.
The calculation is as follows:
[quantity of strips required]=
[quantity of panels] x [strips per panel]
[length required mm)=
[quantity of strips required] x
( [length per strip - mm] + [allowance between strips])
[rolls required]=
[length required in mm] \ [length per roll]
[total cost]=
[rolls required] *[cost per roll] +[markup]