Allowing for Overs in Quotes and Jobs

Follow
Manufacturing has a tolerance and some loss may occur within manufacturing due to routine variance, setting up and other reasons

To allow for this loss we can add a percentage or absolute amount to the calculated quantities required for a job

This additional allowance is called overs

Overs are allowed for in the Layout screen and in the Materials screen.

The formula is  [base overs] + [calculated quantity] + ([calculated quantity] * [percentage overs]






The same fields are found in the layout screen. Within a job the precedence is:

If overs are specified in a material, then this over-rides overs found overs in the layout section


Have more questions? Submit a request
Powered by Zendesk